DISMANTLING

dismantling, oil refineries, redundant tower blocks

The program of replacement of out date and redundant tower blocks has enabled Squibb Group to demonstrate our ability to dismantle tall structures safely and securely. Whether blocks are system built or structures cast insitu, the heights determine that different methods of dismantling are required. This is a complete package including the removal of any asbestos prior to the works and includes the design and installation of tower crane bases.

Before any crane lifting operations are commenced, site-specific studies are undertaken, detailing the exact planned position of the cranage, the types and weights of the elements to be lifted and the precise cutting operations to be effected.

The dismantling or removal of bridges is included in the Squibb Group repertoire. These structures require road or rail closures, or both, and Squibb's are mindful of the effect on the travelling public. Spans can be demolished or lifted out.