MAJESTIC HOUSE - SLOUGH
Working in cooperation with our in house design team we developed an extensive Method Statement and procedures document which incorporated all designs for Scaffolding, Floor Loadings, Crane base design and a Deconstruction Plan.
The project required the deconstruction of two twenty two storey Tower Blocks in central Slough. The project included the identification and removal of all Asbestos products on site and the removal to ground floor slab of the two Tower Blocks. All arising from the Demolition works were processed on site for use in the future redevelopment.
| Site | Majestic House |
| Location | Slough |
| Project status | Completed 2004 |
| Client | Green Property |
| Contract value | £1,400,000 |
| Building Storeys | 22 |